*This is an update of a post that was originally published in December*
On October 21, 2016, Indianapolis Power & Light Company (IPL), an Indianapolis based, vertically integrated utility, filed a formal complaint with the Federal Energy Regulatory Commission (FERC) against the Midcontinent Independent System Operator (MISO) under Section 206 of the Federal Power Act over what it perceives as the mistreatment of its Harding Street Station Battery Energy Storage System (HSS BESS) (Docket EL17-8). Essentially, IPL’s complaint boils down to three “asks,” with plenty of details surrounding timing, ongoing proceedings, and stakeholder input left for FERC to figure out. Continue reading »